Hot Galvanized Steel Water Storage Tank Forming Machine 15000 Liter30000 Liter 25000 Liter for Sale

Intrduction of Organization:

Our company can provide full generation lines and equipment in accordance to your necessity. We offer several various sizes of Storage silo panel machine with our auxiliary tools. We have obtained a great evaluation from users since of advanced technologies, perfect good quality and soon after-sale support.

 

Equipment Information:

Decoiler / Uncoiler:

Coil Width : Max. 1500mm

I.D : 510-610mm

O.D: Max. 1300mm

Ability: Max. ten Tons

Decoiler type: Manual / CZPT/Computerized

 

Feeding & Leveling:

Pinch feeding: 3 Units ( 6 Rollers )

Leveling : 7 Rollers ( Upper three Rollers, Base 4 Rollers )

 

Punching device:

Punching motion: CZPT Punching, Put up-punching

Punching dies: Cr12 Mov Metal, HRC58-sixty two

Punching station: 1-2 Unites ( rely on gap patterns )

Punching in longitude managed by PLC, punching at horizontal modified by handbook hand wheel.

 

Slicing system:

Cutting movement: CZPT Slicing, publish-Cutting ( chopping sheet after forming )

Slicing blades: Cr12Mov with heat therapy HRC58-sixty two

Duration Measuring: Automatic size measuring by encoder & PLC.

Reducing Tolerance: +/-1.5mm(per 3m)

 

Roll Forming Device:

Forming Stations: 17 Stations

Rectifying: 1 device

Roller materials: GCr15 steel, heat therapy

Diameter of shaft: 100mm

Shaft substance: High grade forty five# metal

Travel kind: Equipment-box

Forming velocity: 0-15m/min

Primary power: 22KW(11kw*2)

Servo motor: 2 Models

 

CZPTal management :

PLC: PANASONIC Manufacturer or CZPT-made

Inverter: YASKAWA Model or CZPT-made

Touch monitor: MCGS Brand name or CZPT-made

Procedure variety: Touch screen & Button

 

CZPT Station:

CZPT station: Famous Chinese brand

CZPT electricity: 30KW

 

Runout Table :

Table variety: Simple non-energy kind

Purpose: To support the concluded panels

Equipment Overview:

 

Device Loading:

 
CZPTer Going to:
 
1. 

 

Payment phrases and soon after-sale services:

one) FOB ZheJiang
2) Payment: thirty% T/T deposit, and pay the equilibrium before shipping.
three) Supply time: sixty operating times.
four) Ensure period: twelve months minimal warranty commencing from date of supply. Transport price for elements to be replaced in the course of warranty interval have to be borne by the consumer.
5) CZPT parts: bearings, buttons, chains, magnetic valve, protective tube and so forth.
six) Set up and training:
1. If purchasers check out our factory and examine the equipment, we will train you how to put in and us the equipment, and also teach your workers/technician confront to face.
two. Without having visiting, we will send you person manual and CD to train you to set up and work.
three. Expense OF Installation:
The purchaser ought to spend the installation expenses (USD one hundred a single man 1 working day). To the seller’s appointed account by T/T before the seller’s professionals go to the buyer’s manufacturing unit. The purchaser pays the seller’s specialists journey expense outside China, which includes spherical air tickets charge, lodging and meals, provide transportation from dwelling lodge to the work area, necessary communication, and insurance, etc.

Hot Galvanized Steel Water Storage Tank Forming Machine 15000 Liter30000 Liter 25000 Liter for Sale